Offshore Projects

Vessel Handover To Ocean Yield

ODENSE, DK

Vessel: AMC Connector. Engagement: December 14-25th 2017. For CETEK INC this last ECS engagement aboard the Connector will close a successful 6-year chapter, assisting with the vessel handover to its owner Ocean Yield, representing the ROV department. Alas, a new chapter shall begin.

 

 

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                  Courtesy: Benjamin Chong

 

MS "AMC CONNECTOR" - Yard no: 719 by: STX OSV Søviknes

 

TV videos, featuring the Connector during our projects:

OCTP SURF, GHANA

FULL FIELD DEVELOPMENT PROJECT. SANKOFA FIELD, FPSO, GHANA.

CLIENT: ENI

Construction: Dual HD Schilling Robotics WROV operation. Cable lay. Jumpers. Flow Lines. Flying leads EFL/HFL/STFL, Mini Umbilicals, Cobra heads. UTA & X-TREE HCCS tie-ins, PLETs, FLETs, anchors. Riser lay, riser tie-ins, midline connections. Hub cleaning, seal removal & seal installation ops. Back pressure testing. Acid injection.
Well Dewatering Ops (Baker Hughes). Water Injection Tree, VCCS Flowline Hub SCM replacement (Subsea Control Module).
FPSO UTA & Xtree valve ops (GE).
RCR (Remote Component Replacement Tool (GE) .FLOT. CL5 TT. FLOT CL4 TT. FLX Tool (Cobra Head) Multi-hotstab ops. GE Tooling basket: Stroking Tools, Hub Seal Cleaning & Replacement Tools. LTPC (Hub Long Term Protection Cap). HCCS Heat Bank. ROV Work Basket. Pre & As Built Surveys, GVIs, CVIs, CDIs. Metrology.
Engagement: May 2017 – December 2017; Vessel: AMC Connector (Ocean Yield)

 

 

 

 

 

TAT & SEF-P FPUs, CONGO

 

 

TAT & SEF-P  fuel platforms, Pointe Noire, Congo.

Client: SOUTH OFFSHORE, TOTAL
Construction: Dual HD Schilling Robotics WROV operation. I-tubes & clamp installations. Cable lay and pull-in.
Engagement: December 2016 – January 2017; Vessel: Lewek Inspector, Forland Group.
EPCI project management: SOUTH OFFSHORE, EMAS Chiyoda Subsea

 

 

 

 

 

 

 

 

 

 

 

STORDAL CAN installation

Client: NEODRILL, Norway
Construction: HD Schilling Robotics WROV operation. Conductor Anchor Node Installation @ 1400 msw
Engagement: October 2016. Vessel: Lewek Inspector

 

TLM GYDA

GYDA FPU, REPSOL

ARMADA WELL & GYDA FPU

Client: Repsol
Construction: Dual HD Schilling Robotics WROV operation. Gyda Field, Armada Well Leak Inspection, Valve Ops. Jacket Caisson Chain Repair.
Vessel: Lewek Inspector (Forland Group). Vessel & Project Management: EMAS CHIYODA
Engagement: October 2016

 

2016 IVAR AASEN FIELD DEVELOPMENT, NORWAY

Client: Det Norske, Lundin Petroleum

Construction. Dual HD Schilling Robotics WROV operation. Kongsberg Tooling Basket, Subsea Tooling QDs. Envirex DWP.
FPUs: IVAR AASEN & EDVARD GRIEG.
Vessel: Lewek Inspector (Forland Group). Vessel & Project Management: EMAS CHIYODA

 

Engagement: March-October 2016.
EDVARD GRIEG HD LAUNCH

EDVARD GRIEG FPU – SCHILLING HD LAUNCH

 

 

 

 

 

DET NORSKE IVAR AASEN SPOOL CAMPAIGN

 

 

 

 

 

2014 TROLL-A FPU, STATOIL CABLE LAY & PULL-IN CAMPAIGN, NORWAY

CLIENT: STATOIL. VESSEL: AMC CONNECTOR (OCEAN YIELD)
VESSEL & PROJECT MANAGEMENT: EMAS AMC. 168 KILOMETER CABLE LAY, ONSHORE TO TROLL-A FPU. J-TUBE PULL-IN TO TOPSIDE.

 

 

 

 

 

 

2013 VISUND NORD FPU, RIM CAMPAIGN, NORWAY

CLIENT: STATOIL. VESSEL: AMC CONNECTOR (OCEAN YIELD). EMAS AMC DUAL WROV SCHILLING ROBOTICS HD OPERATION. AKER AKS RIM TOOL. CAP REMOVAL AND TIE-IN.

 

2013 GULLFAKS, STATOIL, TEMPLATE INSTALLATION CAMPAIGN, NORWAY

CLIENT: STATOIL. VESSEL: AMC CONNECTOR (OCEAN YIELD). EMAS AMC DUAL WROV SCHILLING ROBOTICS HD OPERATION.

 

 

 

 

2013 OSEBERG DELTA, TEMPLATE CAMPAIGN. NORWAY

CLIENT: STATOIL. VESSEL: AMC CONNECTOR (OCEAN YIELD).
VESSEL &  PROJECT MANAGEMENT: EMAS AMC. CONSTRUCTION. DUAL WROV SCHILLING ROBOTICS HD OPS. MULTIPLE TEMPLATE INSTALLATION & POPULATION. HATCHES & COVER INSTALLATION.

 

OSEBERG DELTA TEMPLATE, DETAIL

SUBSEA TEMPLATE, DETAIL

AMC CONNECTOR LOADING TEMPLATES

TEMPLATE MOBILIZATION AT HINNA, NORWAY

OSEBERG TEMPLATE, DETAIL2

SUBSEA TEMPLATE

OSEBERG DELTA TEMPLATE

TEMPLATE INSTALLATION OSEBERG DELTA, NORWAY

 

 

 

 

2011 ABB EWIP WINDFARM TRIPLE CABLE LAY, IRELAND – UK

CLIENT: ABB. VESSEL: AMC CONNECTOR (OCEAN YIELD).
VESSEL &  PROJECT MANAGEMENT: EMAS AMC, OSLO. DUAL WROV SCHILLING ROBOTICS HD OPS. TRIPLE CABLE LAY (BUNDLE) VIA HORIZONTAL LAY SYSTEM (HLS) & BUNDLE SYSTEM, UTILIZING BOTH UTT, LTT, and a mobile TT on the aft deck holding the FO cable. Mobilization at Hinna, Norway.

 

 